Tools

Construction Cost Calculator

Get a quick estimate of required building materials along with their costs — then speak to Prime Estates if you want a site-specific brief.

Construction type
Construction mode

Estimated cost

PKR 16,605,000

PKR 8,200 per sq. ft. · 2,025 sq. ft. covered

Discuss this estimate

Grey structure

PKR 9,720,000

Finishing

PKR 6,885,000

Labour / contractor

PKR 13,098,712

Material estimate

ItemQuantityRateCost
Cement810 bagsPKR 1,350PKR 1,093,500
Steel7,088 kgPKR 270PKR 1,913,625
Sand1,721 cftPKR 50PKR 86,063
Crush1,620 cftPKR 75PKR 121,500
Bricks16,200 nosPKR 18PKR 291,600

Figures are indicative planning estimates for Islamabad. Actual cost varies with design, soil, finishes, and current market rates. This is not a contractor quotation.