Construction Cost Calculator
Get a quick estimate of required building materials along with their costs — then speak to Prime Estates if you want a site-specific brief.
Estimated cost
PKR 16,605,000
PKR 8,200 per sq. ft. · 2,025 sq. ft. covered
Grey structure
PKR 9,720,000
Finishing
PKR 6,885,000
Labour / contractor
PKR 13,098,712
Material estimate
| Item | Quantity | Rate | Cost |
|---|---|---|---|
| Cement | 810 bags | PKR 1,350 | PKR 1,093,500 |
| Steel | 7,088 kg | PKR 270 | PKR 1,913,625 |
| Sand | 1,721 cft | PKR 50 | PKR 86,063 |
| Crush | 1,620 cft | PKR 75 | PKR 121,500 |
| Bricks | 16,200 nos | PKR 18 | PKR 291,600 |
Figures are indicative planning estimates for Islamabad. Actual cost varies with design, soil, finishes, and current market rates. This is not a contractor quotation.